Opal Aged Care
Construct Only
Multiple services, including large scale storm cells, provided for this construct only project for the 120-bed residential aged care facility - Opal Aged Care Facility in Alfred Cove, Western Australia.

Objectives
- Civil stormwater, sewer and trade waste drainage
- Water and gas
- Fire hydrant and hose reel services
About The Project
Multiple levels
120-bed facility over 3 levels

$1.5M - $2.5M

BCG Construction

2018-2019
TRIPLE T’S CONTRIBUTION TO THE PROJECT
- Site Assessment
Conducted comprehensive evaluations of the area’s topography, existing drainage infrastructure, and flood-prone zones to inform design decisions. - Collaborative Design Process
Worked closely with city planners and environmental consultants to develop a stormwater management system that met regulatory standards and supported environmental objectives. - Construction and Testing
Executed the construction of stormwater capture systems, green infrastructure elements, and flood mitigation structures, followed by rigorous testing to ensure functionality and compliance.
Get in Touch About Your Commercial Project
Please complete our enquiry form with details of your commercial project and we will get back to you as soon as we can.
08 9240 4000
info@triplet.net.au
Main Office 4/2 Gibberd Rd Balcatta, WA 6021
Mon – Fri . 8.00 – 17.00